7
Boiler’s assembling should be performed by qualified and authorized personnel
(qualified person upon adequate training and authorized for performing maintenance
and repair works).
The fitter’s obligation is to get familiar with the product, its functioning and
protection systems functionality.
Prior to boiler’s assembling it is strictly necessary to get familiarized with
the content of hereby Technical-Start-Up Documentation.
6.1 REQUIREMENTS FOR BOILER-ROOM
The boiler room, where the heating boiler for central heating installation shall
be installed, must conform the requirements of detailed regulations being in
force, at the country of destination (e.g. PN-87/B-02411).
In particular, the following requirements shall be fulfilled:
the boiler rooms should be located as centrally as possible to rooms
which are covered with heating system, and the boiler itself should be
placed as close as possible to chimney (chimneys),
boiler room entrance door should be opened on the outside, and be made of
inflammable materials,
the boiler room should have air blow-in ventilation, a channel with
section no less than 50% of the chimney section, but not less than
21 x 21 cm, with the exit at the back part boiler’s room , (lack of such
ventilation or obstruction may cause: smoking, inability to get higher
temperature),
the boiler room should have air blow-out ventilation under room’s ceiling
with section no less than 25% of the chimney section, but not less than
14 x 14 cm (the purpose of this system is to carry out harmful gases).
NOTE: Employing of mechanical blow-out ventilation is unacceptable.
The boiler room should be provided with day and artificial lighting.
6.2 BOILER’S ARRANGEMENT
Special foundation for boiler is not required, however it is recommended to put it on
concrete platform 2 cm high, but it may be also practiced to put it directly on
the fire-proof floor. Boiler’s layout should ensure easy and safe operation of
such elements, as furnace, ash box and fuel loading, and do not obstruct
cleaning operations.
The front of boiler should be distant from the opposite wall no less than 2 m,
and similarly, boiler’s sidewalls no less than 0.5 m
BOILER’S ASSEMPLY GUIDELINES