EasyManua.ls Logo

scandia 240 User Manual

scandia 240
11 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
ULTRA-SAUNA HEATER
Proudly made in USA since 1964
Gas Heaters - 40,000-80,000 BTU
Installation Instructions
& User Manual
PO Box 636 Eagle Idaho USA. 83616
T: 877.467.2862 F: 208.286.0290 info@scandiamfg.com www.scandiamfg.com
Heater Model __________
Serial # __________
I n s t a l l a t i o n
G u i d e

Other manuals for scandia 240

Question and Answer IconNeed help?

Do you have a question about the scandia 240 and is the answer not in the manual?

scandia 240 Specifications

General IconGeneral
Brandscandia
Model240
CategoryGas Heater
LanguageEnglish

Summary

Installation Guide

Before You Start

Important Precautions

Key safety and operational guidelines to follow before using the heater.

Heater Components

Component List

Identifies and labels all parts included with the heater unit for assembly.

Heater and Sauna Sizing

Heater Sizing Chart

Provides BTU output and corresponding minimum/maximum room sizes for different models.

Sauna Sizing Guidelines

Factors for determining correct sauna room size relative to heater capacity and performance.

Rough-in Dimensions and Guidelines

Rough-in Sizing Table

Detailed measurements for various models, including A, B, C, D dimensions for installation.

Installation Diagrams

Visual representations of rough-in requirements for different heater models and wall configurations.

Back Panel and Control Box Rough-in

40,000 BTU Installation

Instructions for back panel and control box for 40,000 BTU models.

80,000 BTU Installation

Instructions for back panel and control box for 80,000 BTU models.

Exterior Back Panel Dimensions

40,000 BTU Exterior Rough-in

Detailed dimensions and layout for exterior back panel rough-in for 40,000 BTU heaters.

80,000 BTU Exterior Rough-in

Detailed dimensions and layout for exterior back panel rough-in for 80,000 BTU heaters.

Finishing the Sauna Room

Finishing Steps

Procedures for insulating, mounting, wiring, and installing the thermostat and guard rail.

Heater Guard Rail Installation

Guard Rail Components

Lists the components required for constructing a 3-sided heater guard rail.

Guard Rail Installation Procedure

Steps and considerations for properly installing the heater guard rail around the unit.

Gas Burner and Ignitor Overview

Standing Pilot Gas Burner

Details the gas burner assembly, including gas valve, pilot generator, and burner installation.

Piezo Ignitor Wiring

Explains the wiring schematic for the piezo ignitor system connecting controls to the gas burner.

Control Wiring Diagrams

60 Minute Timer Control Wiring

Wiring diagram and instructions for the 60-minute timer control system for the sauna heater.

24 Hour Timer Control Wiring

Wiring diagram and instructions for the 24-hour timer control system for the sauna heater.

Related product manuals