EasyManua.ls Logo

Scotsman CU0715 - Page 27

Scotsman CU0715
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Correct Settings
•Bridge Thickness
– Must release ice as a unit, bridge will be about 3/16
inch and there will be a hollow part in the cube
•Harvest Time
– Must continue long enough to release the ice, plus
10 to 20 seconds more.
– Water fills during harvest, short harvest may increase
scale build up
• Add time if needed to reduce scale build up
• 90 seconds is suggested minimum time in typical water