EasyManua.ls Logo

Seakeeper 1 - Page 22

Seakeeper 1
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
MANUAL
Product:
Document #:
Rev:
Page:
SEAKEEPER 1
90519
1
21 of 29
Section 3: COOLING INSTALLATION
3.0 INTRODUCTION
Reference Drawings and Documents:
90512 Seakeeper 1 Cooling Water Schematic
90594 Seakeeper 1 Cable Block Diagram
TB_90191Seawater Cooling Pump Recommendations
30331 DC Seawater Pump, Seakeeper 1 Assembly
The Seakeeper 1 is shipped with the cooling circuit filled and ready for use. The Seakeeper 1 requires
connection to a raw water pump, referred to as the seawater pump, to cool the closed loop cooling
circuit on the unit. The required seawater flow through the Seakeeper 1 heat exchanger is between
2 4 GPM (7.6 15.2 LPM), under all vessel operating conditions. Prior to operation, confirmation of
glycol level is required.
Seakeeper offers a compatible self-priming DC Seawater Pump (P/N 30331) that is prewired for the
Seakeeper 1 Installation and covered under the standard Seakeeper warranty. See Drawing No.
30331, DC Seawater Pump, Seakeeper 1 Assembly
for details and the Seakeeper Options and
Accessories Price List for pricing information.
Figure 1: Seakeeper 1 Cooling Components

Other manuals for Seakeeper 1

Related product manuals