EasyManua.ls Logo

Seakeeper Ride - Page 2

Seakeeper Ride
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ATTENTION! Advanced Mode congurations should only be changed under extenuating
circumstances, such as replacing system components or if an incorrect calibration has been
condently diagnosed.
For Seakeeper Ride systems installed by end users, follow the steps below to commission your new
system. The full procedure should take approximately 10 minutes if the boat is in a proper location
before starting.
After following both the Mechanical and Electrical installation instructions, begin commissioning by
ensuring the following:
The boat is on an even keel (level port to starboard)
The boat is trimmed level (no excess bow down or stern down angle)
GPS has consistent satellite signal
You have access to Controllers (If the boat is in the water this may not be possible, and
therefore the boat may need to be trailered for the full procedure)
You are aware of the cable side of the Actuators (example: port side Actuator Cable is in the
port cable entry)
You have access to the Distribution Module for unplugging and re-plugging in Controllers
You have access to the MFD and optional Keypad
You have access to circuit breakers
You have access to the engine key switch
No unnecessary persons are on the vessel
6/21/24, 9:02 AM
Seakeeper Ride | Commissioning Instructions – Seakeeper Manuals
https://manuals.seakeeper.com/ride/seakeeper-ride-commissioning-instructions/?print=true
2/41

Related product manuals