EasyManua.ls Logo

Seakeeper Ride - Page 8

Seakeeper Ride
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
the installation. This selection will align the boat motion with the Seakeeper Ride components and
correctly control your boats attitude. Visual conrmation of the Software Modules location on
board should be done at this step to ensure correct positioning on the boat.
Note: Please review the Electrical Installation Manual (SeakeeperRide | Electrical Installation Manual)
and BILT App QR code (below) for precise details on the Software Module location for best
performance.
6/21/24, 9:02 AM
Seakeeper Ride | Commissioning Instructions – Seakeeper Manuals
https://manuals.seakeeper.com/ride/seakeeper-ride-commissioning-instructions/?print=true
8/41

Related product manuals