10
Once the A-frame is ready
put the mast on the boat as
shown. After the rst assem-
bly of the mast when all the
halyards are already in place
you can assemble the mast
on the boat to simplify ma-
nipulation.
Use a fender on the coach
roof for supporting the mast
as you will reposition it in the
hoist position. (Left)
Attach the aft A-frame sup-
port lines on the pad-eyes as
shown on the photo (right)
Leverage the A-frame against
the stanchions and attach
the aft support lines on the
deck.