Cable Connection Guide
PUSH to OPEN THROTTLE
STARBOARD INSTALLATION CENTER INSTALLATION
MANUFACTURER
CABLE
NEST KIT
THROTTLE
LEVER
CABLE
NEST KIT
THROTTLE
LEVER
Mercury 18 & 25 HP #1 #1 #1 #1
Johnson/Evinrude #1 #1 #1 #1
BRP/OMC I/O #1 #1 #1 #1
Yamaha 90HP & up #1 #1 #1 #1
US Marine #1 #1 #1 #1
Suzuki #1 #1 #1 #1
PULL to OPEN THROTTLE
STARBOARD INSTALLATION CENTER INSTALLATION
MANUFACTURER
CABLE
NEST KIT
THROTTLE
LEVER
CABLE
NEST KIT
THROTTLE
LEVER
MerCruiser
Mercury I/O & OB
#2 #2 #2 #2
Volvo #2 #2 #2 #2
Yamaha 70HP & Under #2 #2 #2 #2
Honda #2 #2 #2 #2
Nissan/Tohatsu #2 #2 #2 #2
PUSH for FORWARD SHIFT
STARBOARD INSTALLATION CENTER INSTALLATION
MANUFACTURER
CABLE
NEST KIT
SHIFT
LEVER
CABLE
NEST KIT
SHIFT
LEVER
Volvo I/O & Inboards #3 #3 #4 #4
3300 Cables #3 #3 #4 #4
Mercury 18 & 25 HP #5/6 #6 #7/8 #7
Inboards #3 #3 #4 #4
PULL for FORWARD SHIFT
STARBOARD INSTALLATION CENTER INSTALLATION
MANUFACTURER
CABLE
NEST KIT
SHIFT
LEVER
CABLE
NEST KIT
SHIFT
LEVER
3300 Cables #4 #4 #3 #3
MerCruiser
Mercury I/O & OB
#7/8 #7 #5/6 #6
BRP/OMC I/O
Evinrude/Johnson
#7/8 #8 #5/6 #5
Honda/Nissan/Suzuki #4 #4 #3 #3
Tohatsu/US Marine #4 #4 #3 #3
Yamaha #4 #4 #3 #3
Inboards #4 #4 #3 #3
Cable Mounting Diagram
SECTION 3: SHIFT & THROTTLE CABLE
CONNECTION-CONTROL END.
•PUSH/PULL refer to the direction of cable motion to shift into “for-
ward” or to “open” the throttle.
•Refer to the appropriate manufacturer’s manual for shift and throttle
direction and adjustments.
•Numbered holes on mechanism chassis correspond to holes in shift
and throttle levers (for example: connect cable mount to hole 4 on
chassis and cable end tting to hole 4 on lever).
•Cables and wiring should be pre-installed on control before nal
mounting is made.
NOTE:
I/O = Inboard/Outboard or Sterndrive.
O/B = Outboard.
Page 6 of 20 SeaStar Solutions Installation Instructions and Owner’s Manual Telephone: 610-495-7011