EasyManua.ls Logo

SeeTech iHunter 2.0 CIS/FIT - User Manual

Default Icon
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SERVICE MANUAL
(iHUNTER Series)
REV 1.0

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the SeeTech iHunter 2.0 CIS/FIT and is the answer not in the manual?

Summary

Chapter 5: Operation

5-1. Self Diagnosis

Procedure for initiating and interpreting the machine's self-diagnostic tests.

5-5. Maintenance

Guidelines for regular upkeep and cleaning of the machine.

5-6. Trouble Shooting

Recommendations for resolving operational issues and errors.

Chapter 7: Disassembly & Assembly

7-1. Main Board Disassembly

Step-by-step guide for removing the main control board.

7-2. Motor Board Disassembly

Procedure for disassembling the motor control board.

7-3. Detector Module Disassembly

Instructions for removing the main detector module assembly.

7-5. CIS Board Disassembly

Guide for removing the CIS (Contact Image Sensor) board.

7-6. CF Board Disassembly

Procedure for disassembling the CF (Counterfeit) detection board.

7-7. CF Rear & MR Sensor Disassembly

Steps for removing the CF rear and MR sensors.

7-8. IR Rear Sensor Disassembly

Instructions for disassembling the IR (Infrared) rear sensor.

7-9. CIS (Contact Image Sensor) Disassembly

Detailed steps for removing the CIS sensor unit.

7-10. Upgrade & External Board Disassembly

Procedure for removing upgrade and external interface boards.

7-11. Display Board Disassembly

Guide for removing the machine's display board.

7-12. SMPS Disassembly

Steps for removing the Switch Mode Power Supply (SMPS).

7-13. Main Motor Disassembly

Procedure for removing the main drive motor.

7-14. Sub Motor Disassembly

Steps for removing the auxiliary drive motors.

7-15. Solenoid Disassembly

Guide for removing the machine's solenoid components.

7-16. Kicker Roller Rubber Disassembly

Procedure for replacing the kicker roller rubber.

7-17. Bite Roller Assembly Disassembly

Steps for removing the bite roller assembly.

7-18. Split Roller Assembly Disassembly

Guide for removing the split roller assembly.

7-19. Reject Sensor Disassembly

Procedure for removing the reject sensor unit.

7-20. Reject Pocket Disassembly

Steps for removing the reject banknote pocket.

7-21. Stacker Sensor Disassembly

Guide for removing the stacker sensor.

7-22. Real Time Board Assembly

Procedure for assembling or disassembling the real-time clock board.

7-23. IR Board & IR Connector Board Disassembly

Steps for removing the IR board and its connector board.

Chapter 8: Upgrade & Calibration

SeeTech iHunter 2.0 CIS/FIT Specifications

General IconGeneral
TechnologyCIS/FIT
Hopper Capacity500 notes
Stacker Capacity200 notes
Power SupplyAC 100-240V, 50/60Hz
DisplayLCD
ConnectivityUSB, RS232
Counterfeit DetectionUV, MG, IR

Related product manuals