EasyManua.ls Logo

Serta Works - Step-by-Step Assembly; Step 1: Base and Gas Lift Setup

Serta Works
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Ensure all parts have been removed from the carton and place on a protected surface or
carpet.
2. Check all parts and hardware are the same as the “Parts List”.
3. To begin assembly, place 5 Star Base (2) upside down and insert Casters (1) into bottom
of Base (2).
4. Turn Base (2) right side up on the floor and insert Gas Lift (3) into center hole on Base (2).
5. Place Telescoping Cover (4) over the Gas Lift (3) and rest it on the Base (2).
(4)
(3)
(1)
(2)
6

Related product manuals