EasyManua.ls Logo

Sharp 13VT-K100 - Shifter Installation Procedure

Sharp 13VT-K100
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
13VT-K100/150
13VT-CK10
INSTALLING THE SHIFTER
Figure 1-42.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point 2
Insert
point 1
Half round notch
Shaft 1
Round mark
Loading gear (T)
Insert
point 3
Insert
point 2
Insert
point 4
Insert
point 6
Release
point 3
Shaft 1
Shaft 1
Shaft 4
1. Make sure that the loading gear is at the point 1 as
shown below.
2. Install, paying attention to 6 insertion points and 3
release points.
3. For the phase matching at the insertion point 1, see
the point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Figure 1-43.
Rotation
point 2
Phase-matching
point 1

Related product manuals