EasyManua.ls Logo

Sharp DV-NC55S - Page 31

Sharp DV-NC55S
135 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
35
DV-NC55S/H
DV-NC60H
Figure 8-44.
8-26. INSTALLING THE SHIFTER
Figure 8-43.
1. Make sure that the loading gear is at the Phase-Match-
ing point 1 as shown below.
2. Install, paying attention to insert point 5 and release
point 3.
3. For the phase matching at the insert point 1, see the
Phase-Matching point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point 2
Insert
point 1
Half round notch
Shaft 1
Round mark
Loading gear (T)
Insert
point 3
Insert
point 4
Insert
point 5
Release
point 3
Phase-matching
point 1
Shaft 1
Shaft 1
Shaft 2
Insert
point 2
Rotation
point 2

Related product manuals