EasyManua.ls Logo

Sharp VC-A50 - Page 24

Sharp VC-A50
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
VC-A10/A10S/A500
VC-A50/A50S/A50SB
VC-A60/A75/A80S
Figure 4-37.
4-22 INSTALLING THE SHIFTER
Figure 4-36.
1. Make sure that the loading arm T and S are at the Phase-
Matching point as shown below .
2. Fix the shifter position setting part to the roading arm T
position setting part as shown in figure .
3. Make sure tension arm not run on the shifter as shown
in figure .
a
b
c
Loading arm (T)
Shifter
Insert point
Loading arm (T)
Loading arm (S)
Phase matting
*Not run on the
sifter.
Sifter
Tension arm
a
c
b
Drum
Capstan D.D.
motor
(Bottom side of mechanism chassis)

Related product manuals