EasyManua.ls Logo

Sharp VC-MH80 - Page 30

Sharp VC-MH80
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VCMH80
VC-MH90
-4,Mountin
brake an
3
the connection gear, slow
loading motor assemblies (on
the back of the mechanism chassis).
Note:
(1) Assemble the connect gear.
Let the slow brake leg out of thefront of the
(2) Assemble the slow brake.
(3) Assemble the loading motor unit.
mechanism chassis. Catch the spring to the take-up
fixing guide that is at the left of the A/C head.
8
Slow
Brake
I
I
I
,
,,~
Figure 4-50.
1
0
Before setting up the loading motor, make sure the
When these actions are made smoothly, return the
phase is matched. To do so, turn the connection
mechanism
to
the
state
as shown above.
gear clockwise and check to see if the loading is
Finally
mount the loading motor unit.
complete and if the pinch roller comes into contact.
30

Related product manuals