EasyManua.ls Logo

Sharp VT-3418X - Page 16

Sharp VT-3418X
170 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ADJUSTMENT, REPLACEMENTAND
ASSEMBLY OF MECHANICAL UNITS
Here we will describe a relatively simple service
work in the field, not referring to the more
complicated repairs which would require the use of
special equipment and tools (drum assembly
replacement, for example).
We are sure that the easy-to-handle tools listed
below would be more than handy for periodical
maintenance to keep the machine in its original
working condition.
TOOLS NECESSARY FOR ADJUSTING THE MECHANICAL UNITS
The following tools are required for proper service and satisfactory repair.
These Jigs are used for checking and
adjusting the reel disk height
A/C Head Tilt Adjusting Jig
These Jigs are used for checking and
6
Cassette Torque Meter
JiGVHT-063
CZ
for checking and adjusting the
torque of take-up for measuring
Tension Gauge (3009) .
JiGSG0300
BF
There are two gauges used for the
7
tension measurements, 300 g and
Tension Gauge
(2.Okg) JiGSG2000
BS
.
w
2.0
kg.
Hex Wrench (0.9mm)’
JiGHW0009
AE
<
These Jigs are used for loosening or
8
Hex Wrench (1.2mm)
JiGHW0012
AE
tightening special hexagon type
screws.
Hex Wrench (1.5mm)
JiGHW0015
AE
Alignment Tape (PAL)
VROCPSV
11
f4sz$zg
This tape is especially used for
9
electrical fine adjustment.
Alignment Tape
(NTSC)
VROATSV
VRONBZGS
10
Drum Replacing Jig
JiGDT-0001
BG
This is used for replacement of the
VCR’s upper drum.
16

Related product manuals