BRIDGE
TEST
perform this
test
to
determine
H
the bridge is funcitonal.
Remove
the
bridge from.the pressure control box and
X1
ohms scale
(
0
1.
Use
a
continuity tester, such as multi-meter set on the
Eight individual checks,
or
tests, must be performed. If
the bridge fails even one test,
it
must be replaced.
Using the chart
at
the right, connect the meter wires as
indicated by the black dots for each
test,
then check
the
continuity.
In
Tests
1,
2
and
3,
there should be
NO
continuity.
In
Tests
4,5.and
6,
connect the
+
and
-
meter
wires
as
indicated, check continuity, then switch the meter wire
connections and check continuity again.
You
should
get
NO
continuity one way, and
YES
continuity the
other way.
In
Tests
7
and
8,
connect
the
meter wires as indlcated
by the black dots:Touch the indicated
"G"
wire to one
meter wire, and then
to
the other.
You
should get
NO
continuity one way, and
YES
continuity
the
other way.
Fig
9