ICPMS Preparing your instrument for shutdown
1. To flush out the system, aspirate with rinse solution for five minutes then DI
water for an additional three minutes.
2. Shut down the plasma by clicking the Plasma Off button in LabSolutions
ICPMS software at the bottom-left of the screen. Wait for the shutdown
sequence to complete.
3. Release tension on the peristaltic pump tubing by releasing the guide arms
and detaching tubing from the tube hangers.
Page 1 of 4

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shimadzu ICPMS and is the answer not in the manual?

Shimadzu ICPMS Specifications

General IconGeneral
BrandShimadzu
ModelICPMS
CategoryIndustrial Equipment
LanguageEnglish