EasyManua.ls Logo

Sicce Tidal 110 - Assembly and Startup; Initial Assembly Steps

Sicce Tidal 110
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
ASSEMBLY AND STARTUP
Figure 1
Figure 2
High Low
Insert bottom half of the
telescoping intake tube into
the top half (1). Then, insert the
telescoping intake tube in place
on the pump case (2). (Figure 1)
If you wish to hang a heater on
the lter (Figure 2), press the
sides of the lter (1), pull down
to remove the pump housing
(2), slide in the heater holder to
the bottom of the lter housing
(3). The heater holder can be
inserted to face up or down
depending on the desired
position of the heater. Insert the
pump’s cable into the guides
(4) before re-placing the pump’s
housing (5).
1
2
1
1
3
2
5
4

Related product manuals