Transport, storage and packing
9229 9860 176 0E 9
2013-08-22
• Set the vacuum circuit-breaker down onto the square timbers.
• Hang further sling gear into the transport boreholes.
• Transport to installation site or leave suspended from crane for further work
steps.
Fig. 8 Positioning the square timbers and setting
down the vacuum circuit-breaker
Fig. 9 Transporting without pallet
Siemens Parts