EasyManua.ls Logo

Siemens RVL471 - Page 113

Siemens RVL471
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
113/118
Siemens Building Technologies Basic Documentation RVL471 CE1P2524E
HVAC Products Alphabetical list of operating lines 23.10.2002
Alphabetical list of operating lines
Function, setting, display
Operating line Page
0 to 10
1. Third heating period, start of REDUCED heating 6 30
2. Third heating period, start of NORMAL heating 7 30
2. Third heating period, start of REDUCED heating 8 30
3. Third heating period, start of NORMAL heating 9 30
3. Third heating period, start of REDUCED heating 10 30
A
Actuator closing time 133 77
Actuator opening time 134 77
Actuator running time 85 48
Assignment of d.h.w. heating 121 64
B
Boost of room temperature setpoint 71 37
Building time constant 63 37
Bus power supply 179 84
C
Circulating pump operation during the legionella function 150 81
Clock mode 178 84
Controllers software version 195 84
D
Date 40 33
Date of first day of holiday 12 30
Date of last day of holiday 13 30
DC 010 V heat demand output U
X
181 84
Derivative action time control (Tv) 137 78
Device number 169 84
D.h.w. charging 125 72
D.h.w. charging temperature boost 127 72
D.h.w. priority, flow temperature setpoint 124 69
D.h.w. temperature 27 32
D.h.w. temperature sensor / control thermostat 126 72
Dwelling time at legionella setpoint 149 81
E
End of first ON period 153 83
End of first ON period 33 33
End of second ON period 155 83
End of second ON period 35 33
End of third ON period 37 33
End of third ON period 157 83
F
Flow alarm 171 84
Flow temperature boost mixing valve / heat exchanger 132 77
Flow temperature boost mixing valve / heat exchanger 84 48

Table of Contents

Related product manuals