33/118
Siemens Building Technologies Basic Documentation RVL471 CE1P2524E
HVAC Products 7 Function block "Enduser general" 23.10.2002
7 Function block "Enduser general"
This function block contains settings that the enduser himself can make, as well as
indication of faults.
7.1 Operating lines
Line Function, parameter Unit
Factory
setting
Range
31 Weekday for switching program 2 1-7 1...7, 1-7
32 Start of first ON period hh:mm 05:00 --:-- / 00:00...24:00
33 End of first ON period hh:mm 22:00 --:-- / 00:00...24:00
34 Start of second ON period hh:mm --:-- --:-- / 00:00...24:00
35 End of second ON period hh:mm --:-- --:-- / 00:00...24:00
36 Start of third ON period hh:mm --:-- --:-- / 00:00...24:00
37 End of third ON period hh:mm --:-- --:-- / 00:00...24:00
38 Time of day hh:mm 00:00...23:59
39 Weekday 1...7
40 Date dd:MM 01.01. ... 31.12.
41 Year jjjj 1995...2094
50 Indication of errors 0...255
7.2 Switching program 2
Switching program 2 can be used for one or several of the following functions:
• As a time switch program for the circulating pump
• As a time switch program for the release of d.h.w. heating
• As a time switch program for the multi-functional relay
Switching program 2 of the RVL471 affords a maximum of three ON periods per day.
Also, every day of week may have different ON periods.
As with the heating program, it is not the "switching times" that are to be entered, but
the periods of time during which the program or the controlled function shall be active.
Using setting "1-7" on operating line 31, it is possible to enter a switching program that
applies to all weekdays. This simplifies the settings: if the weekend times are different,
first enter the times for the entire week, then change days 6 and 7 as required.
The entries are sorted and overlapping ON periods combined.
7.3 Time of day and date
The RVL471 has a yearly clock to enter the time of day, weekday and date.
The changeover from summer- to wintertime, and vice versa, takes place automatically.
Should the respective standards change, the changeover dates can be adjusted (refer
to chapter "25 Function block "Service functions and general settings"