Siemens Building Technologies CE1B2540en 74 319 0616 0 b 18.07.2008 22/32
You want to change switching program 2
(Only RVL481, RVL482)
In addition to the switching program for the heating peri-
ods, the controller has a second switching program. In
your plant, your heating engineer has assigned it to
..............................................................................
The factory settings are as follows:
• Daily from 05:00 to 22:00: ON
• Daily from 22:00 to 05:00: OFF
Each day can accommodate a maximum of three ON
periods. The following time settings are required for each
ON period:
• Start of ON period
• End of ON period
If you want to make changes, proceed as follows (analo-
gous to the switching program for the heating periods):