Connecting up   
4.6 Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid connector 
  SCALANCE W788-xPRO/RR / SCALANCE W74x-1PRO/RR 
100  Operating Instructions (Compact), Release 08/2007, A5E00413342-05 
4.6  Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid 
connector
 
Procedure 
 
Remove the two inner shells of the universal sealing ring 
to adapt it to the diameter of the hybrid cable. 
Push the bushing, washer, adapted universal sealing 
ring and the housing over the cable jacket. 
25 mm
30 mm
Remove the following lengths of cable jacket and shield 
braid: 
•  25 mm for the power leads 
•  30 mm for the data leads 
To achieve good shielding, the shield braid must be alt 
least 30 mm long. 
Arrange the data leads according to the color codes on 
the splice element. The following table shows the 
assignment of the data leads. 
Wind the shield braid around the data leads. As a result, 
the shielding of the cable has contact to the shield plate 
of the splice element that will be fitted later.