EasyManua.ls Logo

SIMAG SDN25 - Step-by-Step Cleaning Process

SIMAG SDN25
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PROCEDURE
1. Remove the Front Panel and….
2. ….Top Panel to again access either to the control
box and the evaporator.
3. Remove also the Bin Door.
4. Wait until the end of defrost cycle then Switch OFF
the machine at unit master switch.
5. Scoop out all the ice cubes stored into the bin in
order to prevent them from being contaminated with
the cleaning solution.
6. Flush out the water from the sump reservoir by
removing the over flow stand pipe.
PAGE 2/6

Related product manuals