EasyManua.ls Logo

Sinclair ASGE-18AI - Page 165

Sinclair ASGE-18AI
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DC INVERTER U-MATCH AIR CONDITION MAINTENANCE
148
7,Renew the electrical source
wire of compressor
Install the power cable to
the fixing screw according to
the disassembly
procedures.
Use screwdriver to tighten
the screws fixing the power
cable.
8. Establish vacuum via
Freon nozzle
Establish vacuum inside
the system via Freon nozzle.
9. Recharge refrigerant via
Freon nozzle
Recharge the refrigerant to
the system via Freon nozzle.
The charge volume must
be identical to the
indications on nameplate.
Disassembly and Assembly of 4-way valve
Remark: Before removing the 4-way valve, make sure that there is no refrigerant inside the
pipe system and that the power has been cut off.
Step Illustration Handling Instruction
1. Remove the solenoid valve
Cut off the power and
recycle the refrigerant
properly.
Remove the solenoid vale
with spanner.
Disconnect the
connecting wire
of compressor
Vacuum piping
through the
process pipe
Vacuum piping
through the
process pipe
Vacuum piping
through the
process pipe
Remove the
solenoid valve

Related product manuals