EasyManua.ls Logo

Sinclair ASGE-18AI - Page 167

Sinclair ASGE-18AI
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DC INVERTER U-MATCH AIR CONDITION MAINTENANCE
150
6. Assemble the solenoid
valve
Assemble the solenoid
valve to the new 4-way valve
according to disassembly
procedures.
7. Inspect the system and
charge refrigerant
Carry out leakage
detection to the system. If no
problem, establish vacuum
and charge refrigerant.
Removal and Installation of Fan and Motor
Remark :
Step Illustration Handling Instruction
1. Remove the axial flow
fan
Hold the fan and do not
let it run.
Use spanner to remove
the tightening nuts fixing
the fan.
2. Remove the fan from
motor
Remove the fan from
motor.
3. Remove the electric box
cover
Use screwdriver to
loosen the screws on
electric box cover.
Remove the cover from
electric box.

Related product manuals