EasyManua.ls Logo

Sinclair ASGE-18AI - 1.2 Installation of Ceiling Type

Sinclair ASGE-18AI
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DC INVERTER U-MATCH AIR CONDITIONERS INSTALLATION
4 Installation of round Supply air outlet
Figure 1-1-16
1.2 Installation of Ceiling Type
1.2.1 Before Installation
After receiving the machine, please check for any transport damage. If finding any surface or
internal damage, please immediately report to the transport company or equipment company in
writing.
After receiving the machine, please check the unit and accessories in reference to the packing list.
Ensure that the model is correct and the machine is in good condition. Please also check if the
specification and quantity of accessory parts are correct.
Determine the correct handling route and methods, thus to avoid damaging the unit or causing
possible hazard. For the sake of protection and safety, it is suggested to move the unit with the
packaging box. Even though it is not permitted to do like this under special occasions, do not
remove the packaging box, thus to avoid loosening or falling during handling.
Confirm if the installing foundation is solid. When this unit is to be installed on the metal section of
the building, make sure that the electrical insulation must comply with applicable standards.
Ensure that the place of installation is far from the area where the inflammable or explosive
substances are stored, thus to avoid possible explosion or fire due to leakage.
1.2.2 Installation Site
Such a place where cool air can be distributed throughout the room.
Such a place where condensation water is easily drained out.
Such a place that can handle the weight of indoor unit.
Such a place which has easy access for maintenance.
Such a place where is permitting easy connection with the outdoor unit.

Related product manuals