GTJZ0608ME/0608ME/1932ME
for Sinoboom Poland
Maintenance
Manual
Part No.PL501056110002
Rev: A
May 2022
G T JZ
0608E (2132E)
G T JZ
0808E (2732E)
G T JZ
0808E (2732E)
G T JZ
0808E (2732E)
长沙市宁乡高新技术产业园区金洲大道东
128
0731-87116111 hr@sinoboom . c om . cn ww w .sinoboom . c om . cn
Al w ays F or B e t t er A cc ess Solution s
我们一直在追求新的高
尺寸
210×285mm
20mm
20mm
产品说明书
PRODU C T MAN U AL

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Sinoboom GTJZ1932ME and is the answer not in the manual?

Summary

INTRODUCTION

1 SAFETY

Electrical Safety

Covers hazards related to electricity and protective measures.

Stability and Load Safety

Ensures safe operation by managing platform load and stability.

Work Environment Hazards

Addresses hazards related to the work environment and jobsite conditions.

Operation Safety

Guidelines for safe operation, preventing falls and collisions.

Component and System Safety

Safety precautions for machine components, fire, and battery.

Welding and Post-Operation

Safety requirements for welding and procedures after machine use.

2 SPECIFICATIONS

Machine Specifications

Detailed physical dimensions, weight, and platform specifications for models.

Power System Specifications

Specifications for hydraulic oil, pumps, motors, and electrical system voltage.

Hydraulic Hose and Fitting Specifications

Torque specifications for hydraulic hoses and fittings based on thread size.

Fastener Torque Specifications

Torque values for metric and unified thread standard fasteners.

3 SYSTEM DESCRIPTIONS

Power System

Details the battery configuration and DC motor for powering the machine.

Hydraulic System

Describes the hydraulic system for steering and platform lifting functions.

Electrical System

Explains the electrical system, battery power, and protection breakers.

Machine Control System

Details the machine's control system with dual controllers and data bus.

Safety Measures

Describes safety features including sensors, limit switches, and pothole guards.

4 SERVICE AND GUIDELINES

Machine Preparation, Inspection, and Maintenance

Provides general information on machine preparation, inspection, and maintenance.

Preventive Maintenance

Outlines the necessity and procedures for performing preventive maintenance.

Storage Recommendations

Recommendations for proper storage to ensure cylinder performance and prevent corrosion.

Maintenance and Servicing Precautions

General safety precautions and measures to take before servicing the machine.

5 MAINTENANCE

Conducting a Pre-Delivery Inspection

Procedures and requirements for performing a pre-delivery inspection before machine delivery.

Following a Maintenance Schedule

Guidance on adhering to the regular maintenance schedule using inspection procedures.

Completing a Repair & Inspection Report

Instructions for completing and documenting repair and inspection reports.

6 REPAIR

Platform Components

Procedures for repairing platform controller and related parts.

Scissor Components

Instructions for removing and repairing scissor arm and extension platform.

Chassis Components

Procedures for replacing and maintaining chassis components like tires and rims.

Hydraulic System Repair

Procedures for removing and installing the hydraulic power unit and valves.

Electrical System Maintenance

Details on battery maintenance, charging, and troubleshooting for the electrical system.

Troubleshooting and Diagnostics

Information on identifying and resolving machine faults and errors.

APPENDIX 1: PREPARE THE WORK RECORD BEFORE DELIVERY

APPENDIX 2: REPAIR & INSPECTION REPORT

Checklist A Procedures

List of inspection items for Checklist A, covering manuals and decals.

Checklist B Procedures

List of inspection items for Checklist B, covering wires, tires, and battery.

Checklist C Procedures

List of inspection items for Checklist C, covering filters, weighing, and limit switches.

Checklist D Procedures

List of inspection items for Checklist D, covering bearings, sliders, and hydraulic oil.

Sinoboom GTJZ1932ME Specifications

General IconGeneral
Working Height21.5 m
Platform Height19.5 m
Overall Length4.7 m
Overall Width1.93 m
Weight11700 kg
Platform Capacity250 kg
Axles2
TyresSolid
Tire TypeSolid