EasyManua.ls Logo

Skyjack SJ 46A - Page 30

Skyjack SJ 46A
85 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SJ 46A & SJ 46AJ
December 2007 Page 31
TM
Section 2 - Operation Visual and Daily Maintenance Inspections
2.8-11 Rotary Actuator
Ensure there are no loose or missing parts -
and there is no visible damage.
Ensure all bolts and pins are properly -
tightened.
Ensure all hoses are properly tightened and -
there is no evidence of hydraulic leakage.
2.8-12 Jib (If Equipped)
Ensure there are no loose or missing parts -
and there is no visible damage.
Ensure all bolts and pins are properly -
tightened.
Ensure all hoses are properly tightened and -
there is no evidence of hydraulic leakage.
2.8-13 Boom
Ensure there are no loose or missing parts -
and there is no visible damage.
Ensure all bolts and pins are properly -
tightened.
Ensure there are no visible cracks in welds -
or structure and there are no signs of
deformation.
Ensure all hoses are properly tightened and -
there is no evidence of hydraulic leakage.
Cylinders•
Ensure all cylinders are properly secured -
and there is no evidence of leakage.
Wear Pads•
Ensure all bolts are tight, there is no -
visible damage to the wear pads and that
no parts are missing.
Hoses•
Ensure all hoses are properly tightened -
and there is no evidence of hydraulic
leakage.
Power Track•
Ensure there are no loose or missing -
parts and there is no visible damage.
Rotary Actuator
Jib
Main and Fly Booms
Riser
Power Track
Cylinders
Wear Pads

Table of Contents

Related product manuals