EasyManua.ls Logo

Slackers Ninja Ladder - Maintenance of Your Ninja Ladder

Slackers Ninja Ladder
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
5. MAINTENANCE OF YOUR NINJA LADDER
At the beginning of each play season:
• Check all moving parts including swing seat, ropes, cables, and chains for wear, rust, or other
deterioration. Replace as needed.
• Check all wood members for deterioration and splinters. Sand down splinters and replace deteriorating
wood members.
• X.3.1.1 Loose-Fill Materials:
X.3.1.1 Maintain a minimum depth of 9 in. (23 cm) of loose-fill materials such as wood mulch/chips,
engineered wood fiber (EWF), or shredded/recycled rubber mulch for equipment up to 8 ft. (2.5 m); and 9
in. (23 cm) of sand or pea gravel for equipment up to 5 ft. (1.5 m) high. NOTE: An initial fill level of 12 in.
(30 cm) will compress to about a 9 in. (23 cm) depth of surfacing over time. The surfacing will also
compact, displace, and settle, and should be periodically refilled to maintain a least a 9 in. (23 cm) depth.
Twice a month during play season:
• X.3.1.1 Loose-Fill Materials: X.3.1.1 Maintain a minimum depth of 9 in. (23 cm) of loose-fill materials
such as wood mulch/chips, engineered wood fiber (EWF), or shredded/recycled rubber mulch for
equipment up to 8 ft. (2.5 m) high; and 9 in. (23 cm) of sand or pea gravel for equipment up to 5 ft.
(1.5 m) high. NOTE: An initial fill level of 12 in. (30 cm) will compress to about a 9 in. (23 cm) depth of
surfacing over time. The surfacing will also compact, displace, and settle, and should be periodically
refilled to maintain a least a 9 in. (23 cm) depth.
Once a month during play season:
• Check all moving parts including swing seat, ropes, cables, and chains for wear, rust, or other
deterioration. Replace as needed.
At the end of each play season or when the temperature drops below 32° F (0° C) take in your NINJA
LADDER and store indoors in cool dry location.
• X.3.1.1 Loose-Fill Materials: X.3.1.1 Maintain a minimum depth of 9 in. (23 cm) of loose-fill materials
such as wood mulch/chips, engineered wood fiber (EWF), or shredded/recycled rubber mulch for
equipment up to 8 ft. (2.5 m) high; and 9 in. (23 cm) of sand or pea gravel for equipment up to 5 ft.
(1.5 m) high. NOTE: An initial fill level of 12 in. (30 cm) will compress to about a 9 in. (23 cm) depth of
surfacing over time. The surfacing will also compact, displace, and settle, and should be periodically
refilled to maintain a least a 9 in. (23 cm) depth
b4 Adventure • Denver Colorado 80216 • 1-844-834-4334 QUESTIONS? info@b4Adventure.com •
www.b4adventure.com - DC:111919

Related product manuals