SLAT AES - Commissioning Process; AES Operation Alarms

SLAT AES
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
3.2 Maximum connection sizes
50-75
W
100-150
W
200-300
W
400-600
W
Mains 2.5 mm² 2.5 mm² 2.5 mm² 2.5 mm²
Batteries 2.5 mm² 6 mm² 6 mm² 10 mm²
Load
(
2 outputs
)
2.5 mm² 6 mm² 6 mm² 10 mm²
A
larm reports*
(
unplu
gg
able
)
1.5 mm² 1.5 mm² 1.5 mm² 1.5 mm²
4 Commissioning
Open the battery fuse, or for 50 W to 150 W boards equipped with an automatic reset fuse: connect the
battery wires to the terminal strip, but do not connect the battery terminals.
After the electrical connections are made (mains, loads and batteries).
1. Close the upstream mains circuit-breaker.
2. Check the load output voltage. The LED on the motherboard turns red.
3. Close the battery fuse or connect the battery terminals for 50 W to 150 W boards.
4. Check that the LED confirming correct motherboard operation is illuminated:
o all OK: green,
o mains fault: orange,
o battery or charger fault, or load not present: red (this fault takes priority over a mains
fault).
5. Connect the ground wire and the wire ribbon (if equipped).
6. Close the cover.
Your equipment is in operation when the 2 green LEDs, corresponding to the load outputs, are
illuminated.
5 AES Operation
5.1 Alarms
Mains fault (normal source): signalled locally by a yellow LED and remotely by dry contact with delay
(failsafe).
If the mains is not present or < 195 V.
If the mains fuse is blown or not present.