7 Mounting the Power Unit
SMA Solar Technology AG
Replacement ManualSBxx-1SP-US-41-PU-RM-xx-1016
11. If applicable, plug the terminal block with the
connected cable for secure power supply operation
into the SPS slot in the Connection Unit, and tighten
(torque: 1.7Nm ± 0.3 Nm (15.05in-lb ± 2.65in-
lb)) with a flat-blade screwdriver (blade width:
4mm (5⁄32in)).
12. Commission the inverter (see inverter manual). The inverter ramp-up lasts up to 20 minutes. All
relevant information is transferred from the ConnectionUnit to the PowerUnit, and the
PowerUnit may also be updated.
13. Wait 20 minutes before connecting the inverter to the communication network to avoid the
transfer of false data after the set-up.
14. If the inverter firmware could not be updated prior to replacing the PowerUnit and the inverter
is not yet equipped with the current firmware version, perform a firmware update (see manual
of the inverter).
15. If a firmware update has been carried out, ensure that all parameters have been transferred
correctly and that the inverter feeds grid-compliant current into the utility grid.