EasyManua.ls Logo

Smartpond 52277 - Package Contents; Preparation for Use; Operation Instructions

Smartpond 52277
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PLEASE CALL CUSTOMER CARE BEFORE RETURNING ITEM TO LOWE’S: 1-888-755-4497
EN
3
PACKAGE CONTENTS
Part Description Qty
A Pump 1
B Inlet Screen 1
C Flow Control 1
PREPARATION
Before beginning assembly or operation of product, make sure all parts
are present. Compare parts with package contents list and diagram. If
any part is missing or damaged, do not attempt to assemble, install or
operate the product. Contact Customer Care for replacement parts.
Estimated assembly time: 5 minutes
No tools required for assembly.
OPERATION INSTRUCTIONS
Step 1. Connect the ow
control to the outlet of the
pump and attach tubing to
the ow control. Also attach
the inlet screen to the inlet
of the pump.
NOTE: Tubing is not
included.
1
for proper operation and cooling.
• Operate in freshwater only. Avoid heavily chlorinated water and water
with high pH levels.
• Do not lift the pump by its power cord.