41
EN
•
•
valve in a dedicated site
•
D-
•
•
•
•
“START/STOP”
8
or
5.3 End of operang day
•
•
• Remove all accessories
• “START/STOP”
8
or
• POWER
•
5.2 Connecon of a new Paent Tube Set for the next
operaon
Tubing life cycle
5
The scrub nurse:
The scrub nurse:
The circulang nurse:
The circulang nurse:
The circulang nurse:
The circulang nurse:
• “LAVAGE/RINSE” control of the footswitch
in order to drain
• FORWARD
or REVERSE
or OSCILLATE
control in
•
•
•