Issue 002 - October 2018 | SmithsEP.co.uk | 9
6. Prep ow and return
connections and ready system
pipework for connection
Check connection is good and undamaged
from transit.
7. Fix both ends to the oor
using suitable xings
8. Connect system pipework to
the TRV and Lockshield valves of
each end of the product
5. Position heater where required
Pipe entry is through ooring surface.