504-2033 Iss 1j 5 April 2005
SECTION TWO
TEST SCHEDULE FOR PERIODIC CHECKING OF
paraPAC P200/200D/220D
1. Report Details
2. Check condition of Carry Case.
3. Check condition of Regulator Assembly
4. Check condition of cylinder key.
5. Check Regulator output.
6. Check condition of Input Hose.
7. Check condition of paraPAC.
8. Check condition of patient hose.
9. Check condition of patient valve.
10. Check performance of paraPAC (including alarm functions).
10.1 Check function of On/Off switch.
10.2 Check function of air entrainment NRV.
10.3 Check function of demand/inhibit (P200D/P220D only).
10.4 Check frequency with no air mix.
10.5 Check frequency with air mix.
10.6 Check tidal volume with no air mix.
10.7 Check tidal volume with air mix.
10.8 Check relief pressure/audible alarm with no air mix.
10.9 Check relief pressure/audible alarm with air mix.
10.10 Check O
2
concentration with air mix
11. Check output from Nebuliser connection (P220D).