AMASSTORE GTX5000 User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
Parallel system:
Multiple batteries can connected in parallel to expand capacity and power for
larger capacity and longer power supporting duration requirements.
NOTE: P+ must connect to master pack, and P- must connect to last slave
pack.
Master pack: one of the P+ terminals connect to PCS, the other one paralleling to
another battery for capacity expanding.
Last slave pack: one of the P- terminals connect to equipment, the other one
paralleling to another battery for capacity expanding.
Other slave pack: for each pair terminals, paralleling to another battery for
capacity expanding.
2、Parallel communication cable wiring instructions
Link Port In / Link Port Out communication terminal (RJ45 port) is integrated
with the signal for automatic coding function,it's can automatic identification the
parallel connected slave batteries by internal control software of master battery.
NOTE: The connection order of Port In and Port Out should not be wrong,
otherwise it will lead to the automatic coding failed.
It is required that the Port In of the master PACK do not connected to the