HVR-M25J/M25U/M25N/M25E/M25P/M25C
6-23
6-1-4. CHECK AND ADJUSTMENT
•When the parts of the tape path (tape guide, reel table, etc.) have been removed or parts have been replaced, adjust the following parts
according to the flowchart below.
• ADJUSTMENT POSITION
• ADJUSTMENT ORDER (FLOWCHART)
ADJUSTMENT END
4-12. RISING CHECK
4-11. CURL CHECK AND CURL ADJUSTMENT
4-10. CUE/REV CHECK
4-9. TRACK CHECK
4-8. TRACK ADJUSTMENT AND CHECK
4-7. PREPARATION FOR ADJUSTMENT AND TAPE PATH CHECK
4-6. FWD/RVS BACK TENSION CHECK AND ADJUSTMENT
4-5. TG2/7 ELECTRIC TENSION REGULATOR CHECK AND ADJUSTMENT
4-4. FWD/RVS POSITION CHECK AND ADJUSTMENT
4-3. TG2/7 HEIGHT CHECK AND ADJUSTMENT
4-2. TG1/8 HEIGHT CHECK AND ADJUSTMENT
4-1. REEL TABLE HEIGHT CHECK AND ADJUSTMENT
ADJUSTMENT START -2
When only the TG1/8 guide
is replaced, perform tape
path adjustment after height
adjustment.
If the TG1/8 guide is not
replaced and removed,
proceed to TG2/7 height
adjustment.
Tape Path Adjustment
ADJUSTMENT START -4
ADJUSTMENT START -3
ADJUSTMENT START -1
RV001
RV003
RV002
RV004
TG3
(Tracking entrance, curl)
TG6
(Tracking exit, curl)
TG7
(TG7 height/RVS position, curl)
Spring hook slider
(RVS back tension)
TG8
(TG8 height, curl)
T band adjuster
(RVS position)
Reel table
(height)
RV1 to 4 (MD-76 board)
(TG2/7 electric tension regulator)
S band adjuster
(FWD position)
Spring hook slider
(FWE back tension)
TG1
(TG1 height, curl)
TG2
(TG2 height/FWD height, curl)