EasyManua.ls Logo

Speck pumpen V 55 User Manual

Default Icon
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
1
Supplementary Operating Instructions
for Explosion Protection for Liquid Ring Compressors
These supplementary operating instructions are an addendum to the operating instructions. The
operating instructions for the product are to be observed without fail.
ATTENTION
Any warranty claims including claims for damages cease in case of non-observance.
The liquid-ring compressors are suitable for the intended use for operation in an environment prone to
explosion as well as for the conveying of explosive gases and vapour mixtures, which can also contain
hydrogen.
According to Directive 94/9/EC, the compressors conform to the equipment group II and to the following
categories depending on the type series and on the measurement and safety technology:
Outside the compressor:
category according to
EN 13463
The media of the environment at the site of installation belong
according to EN 13463-1 to the
Temperature classes Explosion groups further details
For all type series
2G T1, T2, T3 or T4 IIA or IIB or IIC
2D
maximum surface temperature (cf 3)
Inside the compressor:
category according to
EN 13463
The conveyed media belong
according to EN 13463-1 to the
Temperature classes Explosion groups further details
For all type series
2G T1, T2, T3 or T4 IIA or IIB
2D
maximum surface temperature (cf 3)
Inside the compressor:
category according to
EN 13463
The conveyed media belong
according to EN 13463-1 to the
Temperature classes Explosion groups further details
for VU 20 to VU 1600, VH 20 to VH 1600 and VZ 110 to VZ 180 only
1G T1, T2, T3 or T4 IIA or IIB Medium contains hydrogen
or
1G T1, T2, T3 or T4 IIA or IIB
The authorizations for the corresponding equipment categories and media apply in each case only in
connection with the measurement-, control- and process-technology necessary for them. The
authorization ceases with a restriction of the functionality of the prescribed safety technology, a modified
operational mode or the non-compliance with the required maintenance procedures. Maintenance work
may only be performed by technically trained personnel.
Question and Answer IconNeed help?

Do you have a question about the Speck pumpen V 55 and is the answer not in the manual?

Speck pumpen V 55 Specifications

General IconGeneral
Frequency50 Hz
MaterialPump housing: PP, Impeller: PPE/PS
Voltage230 V / 400 V
Inlet Diameter50 mm
Outlet Diameter50 mm

Summary

1 Operating thresholds

Key Operating Parameters

Defines essential operational parameters including pressures, temperatures, and ambient conditions for safe operation.

2 Motor allocation

3 Temperature limits

Surface temperature limits for categories

Details surface temperature limits based on EN 13463-1 categories for explosion protection.

4 Identification

5 Permissible operating modes

6 Inertisation in the conveying of gases and vapours which contain hydrogen

7 Measuring-, Control- and Regulation Technology (MCR)

7.1 Required MCR-equipment

Lists essential measuring, control, and regulation equipment for explosion protection.

7.2 Starting up / Operation / Shutdown

7.2.1 General procedural method

Outlines general procedures for startup, operation, and shutdown of compressors.

7.2.2 Sufficient supply with operating liquid

Details requirements for adequate operating liquid supply for compressor function.

7.2.3 Inertisation for hydrogen-containing media

Describes the inertisation process for conveying gases and vapours containing hydrogen.

7.3 MCR flowchart

7.3.1 Category 1G (inside) / 2G/D (outside)

Presents the MCR diagram for compressors of category 1G (inside) and 2G/D (outside).

7.3.2 Category 2G (inside) / 2G/D (outside)

Presents the MCR diagram for compressors of category 2G (inside) and 2G/D (outside).

7.3.3 Category 2G (outside)

Presents the MCR diagram for compressors of category 2G (outside).

8 Maintenance

Checklist for maintenance work

Provides a checklist for regular maintenance procedures and their intervals.