Property of SafeWorks LLC. This information is proprietary and may not be copied or reproduced without written consent of SafeWorks LLC.Swing Stage Checklist 705997-1 Rev C
Checklist for Operating Swing Stages on Wind Turbine Exteriors
√ Read the Code of Safe Practices prior to using platform.
√ ReadthehoistOperational Manual prior to using platform.
√ PerformtheHoist Daily Inspections prior to using the platform.
√ ReadtheGenerator Requirements on the Checklist prior to using platform.
√ Verifytotalplatformweightandliveloaddoesnotexceedhoist’sratedload.
√ Whende-riggingthesecondarywirerope,toremovethesecondarywireropefromthehoist,pushthe
primaryinletguidetothesidetoreleasethesecondarysafetybrake.
√ Verifythatfallarrestsystemsdonotallowtheworkertofalla
distance greater than 6 feet.
√ Knowthemaximumwindspeedallowedforexteriorwork
inthewindfarm.Carryananemometertomeasurewind
speed.Donotworkinunsafewindorweatherconditions.
√ Ensuretaglinesaresecuredtostructuraluprightsof
platform. (1)
√ Verifyfallarrestanchorboltsaretightenedto150ft-lbsof
torque. (2)
√ Keepthedeckcleartoeliminatetriphazards.Usework
bucketstostorematerialsoutsidethedeck/platformarea.
√ Verifykellumgripsonpowersupplyareattachedproperlyto
stirrup.
WARNINGS
√ Topreventdamagetoequipment,de-rigplatformduring
severeweatherconditions.
√ Inspectwireropesforkinks,brokenwiresorbirdcagingprior
to rigging.
√ Donotoverloadtheplatform.Conrmthatweightofthe
totalequipmentincludingworkers,tools,wireropes,power
cordandaccessoriesdoesnotexceedhoistratedload.
√ Verifyallrollersonstirrupmastturnfreelyandthatthereare
nosignsofexcessivewear.(3)
√ Donotdrill,cut,removepartsfromormodifytheplatform.
Ifyouneedsomethingdifferentontheplatform,call
SPIDERat877-774-3370forassistance.
√ Ifhoistisnotoperatingproperly,readtheoperationmanualfortroubleshootinghelp.
Primary (red)
Secondary ( grey)
2 (2x)
1 (4x)
√ Fallarrestanchorhastwoconnectionpoints;one
peroperator.Theseconnectionpointsaretobe
usedwithashock-absorbinglanyard.(4)
√ Verifythelifelineisproperlyattachedtothe
platformatthetoprailbumperplate.Thelifeline
isusedtostabilizetheplatformonthebladeor
tower.Toreleaselifelinefromropegrab,pull
ropetowardsropegrabandthenreleasecam.
(5)
√ Verifythesupportisinplaceandboltsare
secure. (6)
√ Verifythehoistnameplateinformationmeetsthe
requirementsforvoltagesuppliedtothehoistand
capacityratingsoftheplatform.(7)
√ Verifythestoragebucketisproperlyattachedto
theplatformanddrainholesinthebucketare
freefromdebris.Toremoveorrelocatethe
storagebucket,pullthespring-loadedpinto
disengage it from the platform. (8)
√ Verifythehoistlanyardisattachedtothehoist
carryinghandleandthestirrupasshownin
detailed picture to secure hoist in the upright
position. (9)
√ Verifytherollerbumpersaresecuredtothe
platform.Verifytherollerbumpersturnfreely
and are in good condition. (10)
√ Verifythehitchpinsareinstalledandaresecured
withahairpin.(11)
4 (2x)
9
5
10 (6x)
8
7
3
11
11 (2x)
6