© 2013–2017 Schneider Electric All Rights Reserved
I-Line™ Combo Switchboards 80043-808-02 Rev. 02
Installation—I-Line Interior Trim Barrier Preparation 03/2017
22
ENGLISH
Panelboards Equipped with Motor Operators for PowerPact H and J Frame
Circuit Breakers
HAZARD OF ELECTRICAL SHOCK, EXPLOSION, OR ARC
FLASH
• Apply appropriate personal protective equipment (PPE) and follow safe
electrical work practices. See NFPA70E, CSA Z462 or
NOM-029-STPS.
• This equipment must be installed and serviced only by properly
trained qualified electrical personnel according to OSHA
1910.331 through 1910.335.
• Turn off all power sources supplying this equipment and de-
energize all primary and secondary circuits before working on or
inside equipment.
• Locking the manual operation or locking the motor cover does not
disconnect the secondary motor circuit.
• Always use a properly rated voltage-sensing device to confirm
equipment is de-energized.
• Always practice lock-out tag-out procedures according to OSHA
requirements.
• Do not disable, remove, or modify any mechanical, electrical
interlock, or safety feature.
Failure to follow these instructions will result in death or
serious injury.
80043-808-01.book Page 22 Wednesday, March 22, 2017 12:31 PM