EasyManua.ls Logo

Ss Brewtech FTSs2 - Page 9

Ss Brewtech FTSs2
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Heater
Pump
12V
D
C
Page 9
8. Place the digital controller’s temperature sensor into the thermowell. Be sure the sensor goes all of
the way into the bottom of the thermowell.
9. Plug in the pump power cable, the heating pad power cable and system power supply as marked on
the digital controller.
ASSEMBLY INSTRUCTIONS (CONTINUED)
Heater Power Cable
Pump
Power Cable
Thermowell
Temperature Sensor
Temperature Sensor
at bottom of Thermowell
System Power Supply Cable