EasyManua.ls Logo

Stanley 7400-Series - Page 4

Stanley 7400-Series
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. INSTALLATION INSTRUCTIONS
3.1 Checking the Rough Opening
3.1.1 ENSURE floor is level across the entire opening.
NOTE
The door shall be installed within the rough opening such that an average clearance between the door and
rough opening is V/ along the pivot and top edge; Vg" along the lead edge for a single panel; V/ along the
bottom; and Vie" along the meeting edge for a pair.
3.1.2 CHECK opening width.
3.1.3 CHECK opening height ivvm finished floor.
3.1.4 SWEEP floor.
3.2 Attaching the Jambs to the Header (I3//' Header Option)
3.2.1 Refer to Figure 1, and, using one 'A -20 X screw and one 'A -20 X 1 l/f screw with
spring lockwashers, ATTACH header bracket to rivnuts in jamb.
3.2.2 POSITION end of header extrusion over the header bracket.
3.2.3 Using four Va -20 X V/ CS screws, ATTACH header to header bracket.
3.2.4 REPEAT Section 3.2 for opposite end of header.
©2011, THE STANLEY WORKS. ALL RIGHTS RESERVED.
204068
Rev. B, 2/26/11
3 of 15