© 2021 Pinnacle Climate Technologies, Inc.
NEVER LEAVE HEATER UNATTENDED WHILE BURNING OR  
WHILE CONNECTED TO A POWER SOURCE
Assembly Instructions
ST-125-OFR-E
-  Remove the heater and all packaging    
  materials from the shipping carton.
Note:  Save the box and packaging materials  
  for future storage.
What’s In The Box
Long Screws (6) Short Screws (4)  8 mm Nuts (6) Tires (2)
Visor (1) 19 mm Axle Nuts (2)
Spacers (2) Washers (2)
Axle (1)
Safety Guards (Top, Front) Wheel Frame
6