EasyManua.ls Logo

STARLINK Wedge - Option 3 - Blind Hole Nuts and Machine Screws

STARLINK Wedge
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Option 3 – Blind Hole Nuts and Machine Screws
3. Apply silicone sealant in and around holes and
insert the blind hole nuts. The base of the blind
hole nut should be flush with the install surface.
4. Install a washer on each of four machine
screws and apply silicone sealant to threads.
Insert the four machine screws into mount
and blind hole nuts.
5. Use the 7/16” socket wrench to tighten screws
to snug plus 1/4 turn; do not overtighten. Ensure
blind hole nuts are fully collapsed on the interior
side of the mounting surface.
1. Using the Wedge Mount as a guide, mark the four corner
hole locations with the pencil and remove the mount.
NOTE: Blind hole nuts work with surfaces 0.18 - 0.31”
(4.75 - 7.85 mm) thick.
2. Drill four 1/2” (13 mm) holes through the surface
at the marked locations. Remove burrs around
holes and make sure the surface is free of debris.