INSTALLATION
Installation
9
| DHB-E LCD www.stiebel-eltron.com
10. Installation
Factory settings DHB-E11/13LCD DHB-E18 LCD25A DHB-E 18/21/24LCD DHB-E27LCD
Internal anti-scalding protection °C 60 60 60 60
Connected load kW 13.5 18 21 27
Connected load options x - x -
Standard installation DHB-E11/13LCD DHB-E18 LCD25A DHB-E18/21/24LCD DHB-E27LCD
Electrical connection from below on unfinished walls x x x x
Water connection on unfinished walls x x x x
For further installation options, see chapter "Alternative instal-
lation methods".
10.1 Standard installation
Opening the appliance
D0000053271
f Open the appliance by holding the fascia at the side and pull-
ing forwards away from the appliance cover. Undo the screw.
Pivot open the appliance cover.
D0000053272
f Remove the back panel by pressing the two locking tabs and
pulling the lower section of the back panel forwards.
Preparing the power cable on unfinished walls, for connection
from below
160
30
D0000053273
1
1 Cable entry installation aid
f Prepare the power cable.
Fitting the wall mounting bracket
D0000059694
f Mark out the holes for drilling using the installation tem-
plate. If the appliance is to be installed on finished walls, also
mark out the fixing hole in the lower section of the template.
f Drill the holes and secure the wall mounting bracket at 2
points using suitable fixing materials (screws and rawl plugs
are not part of the standard delivery).
f Fit the wall mounting bracket.
Installing the twin connectors
!
Material losses
Carry out all water connection and installation work in
accordance with regulations.
12
D0000053319
f Seal and insert the twin connectors.