EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 43

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operations Model 6DS-SP Planarizer
1 - 24 Version 4.0 - February 1998; Update 10/19/01
LOCKOUT PROCEDURE
Per ANSI Z244.1-1982
Lockout procedure for Strasbaugh Polishing, Lapping, Grinding,
and Cutting Machines
PURPOSE
This procedure establishes the minimum requirements for lockout of energy
sources that could cause injury to personnel. All maintenance personnel,
operators, and machine owner employees shall comply with the procedure.
RESPONSIBILITY
The responsibility for seeing that this procedure is followed is binding upon
all machine maintenance personnel. All machine maintenance personnel
shall be instructed in the safety significance of the lockout procedure by the
information contained herein and instruction provided by the machine owner
designated safety personnel. Each new or transferred affected operator or
maintenance person shall be instructed accordingly in the purpose and use of
the lockout procedure.
PREPARATION FOR LOCKOUT
Maintenance personnel authorized to perform lockout shall be certain as to
which switch, valve or other energy isolating devices apply to the equipment
being locked out. More than one energy source (electrical, mechanical, or
others) may be involved. Any questionable identification of sources shall be
cleared by the employees with their supervisors. Before lockout
commences, job authorization should be obtained.
Sequence of Lockout Procedure
1. Notify all affected employees that a lockout is required and the
reason therefore.
2. If the equipment is operating, shut it down by the normal stopping
procedure (depress stop button. open toggle switch, etc.).

Related product manuals