Do you have a question about the Strong Enterprises TNT System and is the answer not in the manual?
Brand | Strong Enterprises |
---|---|
Model | TNT System |
Category | Sports & Outdoors |
Language | English |
Provides historical context and evolution of tandem skydiving.
Defines the coverage of this manual for the TNT Parachute System.
Specifies system limits for load, speed, and prohibited component usage.
Details the required repack cycle for the reserve canopy and packing requirements.
Details instructor harness, student harness, main and reserve deployment systems.
Provides contact information for submitting feedback on product design and performance.
Introduces the information provided for tandem instructors.
Explains main and reserve deployment sequences and operational functions.
Provides detailed instructions for fitting instructor and student harnesses correctly.
Outlines the essential airworthiness inspection steps before each jump.
Introduces the section on inspection, rigging, and maintenance.
Provides guidelines for maintaining the TNT system to ensure its longevity and safety.
Discusses factors affecting the system's service life and the importance of inspections.
Details the initial comprehensive inspection of the system's components and assembly.
Specifies thorough inspection procedures for the reserve canopy and its components.
Outlines detailed inspection procedures for the main canopy and its related parts.
Provides instructions and limitations for repairing parachute system components.
Details the construction method for reserve and main closing loops.
Introduces the procedures for rigging and packing the TNT system.
Lists components approved for use with the TNT system, found on the website.
Lists the necessary tools and consumables for rigging and packing the TNT system.
Details AAD installation and reserve canopy preparation steps.
Outlines canopy continuity check, brake stowing, folding, and freebag packing.
Covers closing sub flaps, pilot chute/air anchor, top flaps, and pin cover flap.
Details attaching drogue, main risers, and installing closing loops.
Includes continuity check, brake setting, canopy flaking, and packing into ALS bag.
Presents line charts for SET-400 and SET-366 main canopy general installation.
Contains the TSO authorization letter from the FAA for key system components.
Summarizes drop test results for various weights and speeds, and live jump data.
Provides a checklist to ensure all steps of the maintenance check are completed.