EasyManua.ls Logo

Studer SI Series - Page 9

Studer SI Series
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STUDER INNOTEC SI
User manual SI V3.0 E 9
Option SI performance 3-phased
Three SI inverters can be connected together to
build a 3-phased grid. They have to be equipped
with the PE option.
Working
Two ways of working are possible with the SI
performance :
1) Working alone
One SI inverter can be used alone. The inverter
works then as a single one, like it is described in
this manual.
2) Working in a grid
Thanks to the connecting cable, three inverters
can be connected together in order to obtain a
3*400V 3-phased grid.
Connecting
1) Check that the inverters are in OFF position.
2) First link together the neutral of all 3 devices
by taking care that this connecting point be not
further than 1 m from each inverter.
3) Link together the battery cables (take care to
not reverse the polarity). The 3 inverters have to
be connected together to only one battery bank.
Commissioning
At the time of commissioning it is necessary to
operate all the 3 inverters. The inverters work
independently from each other and can be
loaded in an asymmetrical way. They can work
either in stand-by mode or in ON mode (see
working description in this manual.

Related product manuals