4
PREPARING THE SPACE
Step 1: First, make sure that the opening where the
Sub-Zero is to be installed is properly prepared. Refer to the
Pre-Installation Specifications illustrations and chart to be
sure the space dimensions, electrical service and plumbing
are correct for the model you are about to install.
IMPORTANT NOTE: To operate properly, the door must
open a minimum of 90°. Use a minimum 2" (51 mm) filler
in corner installations to assure a 90° door opening. Allow
enough clearance in front of the unit for full door swing.
IMPORTANT NOTE: Make sure the floor under the refrig-
erator is level with the surrounding finished floor. Protect a
finished floor with plywood, cardboard or some other suit-
able material before moving the refrigerator across it.
200
SERIES
PRE-INSTALLATION SPECIFICATIONS
MODELS 249R, 249R, 249FF AND 245
ROUGH-IN REQUIREMENTS
200 IG 3758400 1-04.qxd 1/2/2004 7:55 AM Page 4